Floor screed calculator
How it’s calculated
Volume = area × thickness. Sand–cement dry mix takes about 20 kg per m² for each 1 cm of thickness.
Mixed on site, the mortar is counted at 1:3 (M400 cement : sand) — about 430 kg of cement and 1.1 m³ of sand per 1 m³ of mortar.
Screed is usually 3–7 cm. Pipes or insulation underneath mean a thicker layer. The reserve covers an uneven base.